Amerimix
EZ Scaffold Corp.
EZG Manufacturing
Hydro Mobile, Inc.
Loot
Non-Stop Scaffolding
PROSOCO, Inc.
SOLA/Keson
SPEC MIX LLC
Stabila
Westlake Royal Stone Solutions
Find-a-Contractor Masonry Buyer's Guide

Improving Scheduling Practices: Understand the Impacts of Jobsite Productivity

Provider: Informa
Discipline: Ethics & Business Practices
Credits: 3.00

Scheduling and productivity must be addressed together. While productivity in the construction industry remains stagnant, construction schedules are often unrealistic and not a true indicator of time needed to complete a project. This seminar will examine the connection between productivity and the schedule. We will discuss how and why productivity should be analyzed and what data is critical for both improvement and realistic scheduling. Productivity improvement strategies will also be discussed. Finally, the focus will be on productivity improvement plan that a business unit can implement once useful data is collected.
1. Demonstrate how productivity directly impacts the construction schedule
2. Outline methods to track and analyze productivity
3. Develop a strategic plan to increase jobsite productivity and reduce the schedule
4. Recognize key areas for productivity improvement

For more information please visit www.worldofconcrete.com or contact Informa at 972-536-6416.

Future Dates and Locations

Link Date Time Location Speaker Cost
No courses scheduled

“The opportunity to ‘talk shop’ with other mason contractors is extremely valuable.”

Joe Bonifate
Arch Masonry & Restoration
MCAA member since 2012

Learn More